|
Company:
|
Contact
/ Phone #:
|
Doing
business since:
|
Job
descriptions:
|
|
Quality
Pork
|
Kelly
Boerhave
507-433-0300
|
2002
|
Installed over 10,000+ sq. ft. of 200XT (1/4” system) in
production areas with EXTREME abuse.
-
more work to be scheduled
|
|
Stockyards
(formerly
Westlunds)
|
Tim
Bartusch
651-450-6000
|
1992
|
Installed
4,400 sq. ft. of 200XT with a Double Coat using Aluminum Oxide for a top
coat.
-
more work to be scheduled
|
|
John
Morrell
|
Steve
Marso
605-338-8200
|
2000
|
John
Morrell averages about 20 kits of our Indu-Poxy 200XT per month. Maintenance
Dept. orders direct and install themselves.
|
|
AMPI
Rochester
|
Harry
Root
507-282-7401
|
1999
|
Installed
multiple production areas; just recently coated a new milk receiving bay
-
more work to be scheduled
|
|
Kemps
Farmington
|
Jeff
Kinell
651-463-7093
|
1997
|
Installed multiple production areas with coatings
and tile replacement/re-grouting jobs.
-SAVED
OVER $20,000.00 ON ONE PROJECT BY DOING THE WORK ON A TIME AND MATERIAL NOT
TO EXCEED BASIS.
|
|
Novartis
Nutrition
|
Missy
Bautch
952-848-6622
|
1998
|
Installed
multiple production areas with coatings and tile replacement/re-grouting
jobs.
|
|
Bongards
Creameries
|
Tim
Dreier
952-466-3521
|
1997
|
Installed
multiple production areas with coatings and tile replacement/re-grouting
jobs.
|
|
Seneca
Rochester
|
Jim
Haukom
507-280-4500
|
2000
|
Coat
many production areas with our Indu-Poxy 100P saturated with Aluminum Oxide
(Spring 2004)
Around
5,000+ square feet over the last few years of mostly Double Coat systems.
-
more work to be scheduled
|
|
Seneca
Rochester
Warehouse
|
Jeff
Glasrud
507-280-4571
|
2002
|
2,000+
square feet of production area floors with the Double Coat system.
-
more work to be scheduled
|
|
Seneca
Glencoe
|
Dave
Elfstrand
320-864-2287
|
1993
|
One
of the largest food/vegetable processing facilities in the world.
Indue
has covered many areas in 100P and 200XT.
|